Port-au-Prince · Sun & Moon
Port-au-Prince · 18.5333°, -72.3333° · America/Port-au-Prince
Port-au-Prince · 2026-10-07 · America/Port-au-Prince Dated reference table
Sun at −12°
Sun at −12°
Times refer to the printed local date. A dash means no event within that date.
Next seven days
| Date | Sunrise | Sunset | BMNT | EENT | Moonrise | Moonset | Daylight | Moon lit |
|---|---|---|---|---|---|---|---|---|
| 10/07 | 06:41 | 18:33 | 05:54 | 19:20 | 03:51 | 16:37 | 11h 52m | 10.1% |
| 10/08 | 06:41 | 18:32 | 05:54 | 19:19 | 04:46 | 17:14 | 11h 51m | 4.5% |
| 10/09 | 06:42 | 18:31 | 05:54 | 19:18 | 05:40 | 17:49 | 11h 50m | 1.2% |
| 10/10 | 06:42 | 18:30 | 05:55 | 19:18 | 06:34 | 18:26 | 11h 49m | 0.1% |
| 10/11 | 06:42 | 18:30 | 05:55 | 19:17 | 07:27 | 19:04 | 11h 48m | 1.2% |
| 10/12 | 06:42 | 18:29 | 05:55 | 19:16 | 08:21 | 19:44 | 11h 47m | 4.4% |
| 10/13 | 06:43 | 18:28 | 05:55 | 19:16 | 09:16 | 20:28 | 11h 45m | 9.3% |
Times are local to the selected city. Moonset may occur before moonrise on the same date. Swipe horizontally for all columns.
Sun through the day
North 0° · East 90° · South 180° · West 270°. The curve shows geometric solar-center altitude.
Twilight times
| Type | Morning | Evening | Altitude |
|---|---|---|---|
| Astronomical | 05:29 | 19:45 | −18° |
| Nautical | 05:54 | 19:20 | −12° |
| Civil | 06:19 | 18:55 | −6° |
BMNT = nautical dawn. EENT = nautical dusk. A dash means no crossing within the selected local date.
Moon phase
- New Moon10 Oct, 11:50
- First quarter18 Oct, 12:13
- Full Moon26 Oct, 00:12
- Last quarter1 Nov, 15:28
Photography and dark-sky windows
Moonless astronomical night
00:00–03:51 · 19:45–00:00
Sun below −18° and Moon below the horizon. Weather, terrain and light pollution are not included. Photography windows use the thresholds described in the guide. Read the definitions
Coordinates & calculation basis
Sea level (0 m), an unobstructed horizon and standard atmospheric refraction. City-center/reference coordinates are not exact viewing-site coordinates. Compare official almanac data when a certified reference is required.